Piling attendant
Construction specialist operative or technician · Technical · Onsite Construction
The official framework — 44 requirements.
Every Knowledge, Skill and Behaviour below is the verbatim regulatory text of the Piling attendant apprenticeship standard (v1.0). On EngTree, each one becomes a node — verified knowledge entries, training modules and End-Point Assessment evidence all map back to it.
Knowledge (17)
What the apprentice must understand
- K1
The principles of health, safety welfare and environmentally responsible work practices and how they must be applied in relation to the work and to others
- K2
Operatives responsibilities under current legislation and official guidance to undertake the work
- K3
How to communicate with others and follow organisational procedures to conform to productive work practices including sustainability
- K4
How to support piling operations including the duties and responsibilities of other members of the piling team
- K5
How to interpret types of information, drawings, method statements, risk assessments, manufacturers™ information, work schedules and specifications
- K6
How building information modelling supports piling operations
- K7
How to handle and move loads manually and with mechanical aids
- K8
What the specific requirements are for conducting lifting operations
- K9
How to maintain tools, plant, machinery, lifting accessories and equipment
- K10
How to use and what the specific requirements are for operating plant, machinery and equipment
- K11
How to comply with quality requirements when working
- K12
How to rig and derig piling plant, machinery and equipment
- K13
How to transport, handle, pour, position, lay and protect concrete for curing
- K14
How to take samples
- K15
The techniques and characteristics of piling processes, to include, but not limited too; Continuous Flight Auger, Rotary Large Diameter, Driven “ Pre-cast, sheet, and Vibro
- K16
How to recognise changes in geology while piling
- K17
How to react in an emergency
Skills (18)
What the apprentice must be able to do
- S1
Work safely on site and comply with environmentally responsible work practices
- S2
Supply information on the activities and progress of the work
- S3
Contribute to sustainable practices in piling operations
- S4
Manually handle loads
- S5
Sling and signal the movement of suspended loads during lifting operations
- S6
Carry out user maintenance on tools, piling plant and machinery
- S7
Guide and control the movement and operations of piling plant, machinery and vehicles
- S8
Off load and load vehicles
- S9
Operate powered units, tools, machinery and equipment specific to piling operations (e.g. concrete pumps, generators, compressors agitators, pressure washers or lighting sets)
- S10
Support, work as part of a team, to rig and derig piling plant and machinery
- S11
Monitor the delivery of concrete and take samples for testing
- S12
Transport, handle, pour, position and lay concrete and protect it for curing
- S13
Continuous Flight Auger: A continuous flight augering drill is used to excavate a hole and concrete is injected through a hollow shaft under pressure as the auger is extracted. This creates a continuous pile without ever leaving an open hole
- S14
Rotary Large Diameter: uses a bored piling machine with specially designed drilling tools, buckets and grabs to remove soil and rock. The auger with 4 or 5 turns of flight is bored into the ground, withdrawn, and the spoil removed. This process is repeated until the design depth is reached. Reinforcement is then positioned and concrete placed.
- S15
Driven - Pre-cast: metal or pre-cast concrete piles are usually top-driven using hydraulic drop hammers, some of which are super-silenced. Pre-cast concrete piles can be designed for compression and nominal tension and bending, accommodation of compression and tension, and with full moment-transfer joints
- S16
Sheet or Vibro: Vibratory pile hammers contain a system of counter-rotating eccentric weights, powered by hydraulic motors, and designed in such a way that horizontal vibrations cancel out, while vertical vibrations are transmitted into the pile. The pile driving machine is lifted and positioned over the pile by means of an excavator or crane, and is fastened to the pile by a clamp and/or bolts. Vibratory hammers can either drive in or extract a pile; extraction is commonly used to recover steel "H" piles used in temporary foundation shoring (sheet piling)
- S17
Identify excavated soils and types of rock
- S18
Apply first aid "At Work"
Behaviours (9)
How the apprentice must conduct themselves
- B1
Effective communication: oral, written, electronic, listening, body language and presentation
- B2
Respect: apply equality, diversity and inclusion in dealing with others
- B3
Team work: work effectively and safely with others under minimum supervision
- B4
Independent working: take responsibility for safe completion of your own work
- B5
Logical thinking: use clear and valid reasoning when making decisions to undertake the work instructions
- B6
Working effectively: undertake the work in a reliable, safe and productive manner
- B7
Time management: use own time effectively to complete the work instructions to schedule
- B8
Adaptability: be able to adjust to changes to the work instructions.
- B9
Assertiveness and confidence: able to resist pressures to work following unsafe practices