TBM Annie - Thames Tideway Tunnel (Central)

Central London, UK (Kirtling Street to Chambers Wharf) · 2016-2022 (Tunnelling started 2016, overall project completion 2025) · £4.2bn (Project total)

The judgement call

Account-gated at launch

Named after Annie Maunder, an astronomer and pioneer in solar photography. Part of the 'super sewer' project to clean up the River Thames.

Key engineering challenges

Tunnelling through varied ground conditions beneath a major city. - Minimising disruption in a densely populated urban environment. - Managing large volumes of excavated material.

Project facts

Client / owner
Tideway
Lead contractor
Ferrovial Agroman UK and Laing O’Rourke Construction Joint Venture (FLO JV)
Lead designers
Project type
new build
Scale
Tunnel length: 7.2km (Central section); TBM diameter: 8.85m
Disciplines
civil; structural; mechanical; electrical; systems; tunnelling; geotechnical; environmental
Standards & frameworks
NEC4 (New Engineering Contract), CDM Regulations, UK water industry standards.

Sources: Tideway.london (https://www.tideway.london/news/press-releases/2019/november/new-map-shows-progress-of-giant-machines-creating-super-sewer-beneath-the-thames/) - Herrenknecht AG (https://www.herrenknecht.com/en/references/referencesdetail/thames-tideway-tunnel/) - Jacobs (https://www.jacobs.com/projects/thames-tideway-tunnel)