EngTree
Engineering vehicles & heavy plant
Engineering vehicles & heavy plantModular Bridge Construction / Erection

Chievely Bridge, West Berkshire (PCE Ltd Modular Construction)

Chievely, West Berkshire, UK

The judgement call

Account-gated at launch

PCE Ltd specializes in Design for Manufacture and Assembly (DfMA) and hybrid solutions, making it highly probable that their work on Chievely Bridge involved modular construction techniques. This approach allows for faster, safer, and higher-quality construction by moving significant portions of the build offsite. While the specific use of a dedicated bridge erection gantry is not confirmed for this project, PCE Ltd's expertise in modular construction implies the use of advanced lifting and positioning equipment.

Key engineering challenges

Efficient and rapid erection of bridge structures using offsite manufactured components. - Ensuring precise alignment and connection of modular elements. - Minimizing disruption to traffic or surrounding environment during construction.

Project facts

Client / owner
Lead contractor
PCE Ltd
Lead designers
PCE Ltd (for modular construction approach)
Project type
new build | upgrade
Scale
Bridge construction using modular or hybrid solutions; specific dimensions not available.
Disciplines
civil; structural; mechanical; modular construction
Standards & frameworks
Eurocodes, relevant British Standards for bridge design and construction, CDM Regulations.

Sources: PCE Ltd (https://pceltd.co.uk/projects/past-projects/chievely-bridge-west-berkshire) - PCE Ltd (https://pceltd.co.uk/news/the-power-and-possibility-of-modular)