EngTree
All Project Packages
Renewable Energy Infrastructure6 slices · 7+ paired entriesPath B mocks-first preview

50MW Solar Farm Delivery

The capability stack for designing and delivering a 50MW utility-scale ground-mount solar farm. Civils, structural mounting, DC + AC electrical, grid connection, ICP coordination. UK-specific framework aligned to MCS + DNO requirements.

Pricing model

Buy the full capability stack, or a single discipline slice.

Full Package = all 6 slices + curator-assembled coordination content + lead validator support. Single slice = one discipline for specialist firms. 2-3 slice bundles negotiated case-by-case.

Full Project Package

£80-110k

One-off · 12-month renewable licence model lean

Request early access

Mock CTA — live Stripe Phase 1.5

What's inside

6 discipline slices · all chartership-validated · paired entries throughout.

Utility-scale solar is forecast to triple in UK deployment by 2030. Current capacity is concentrated in 4-5 specialist developers who emerged from the early ROC era. Mid-sized civil and electrical firms wanting to enter typically lack the grid-connection expertise that determines project bankability. This Package gives them the structured capability transfer.

The six slices

Each slice is individually purchasable for specialist firms. Premium slices (Technical Interfaces — coordination knowledge) command higher pricing because the knowledge is structurally rarer.

  • Civil

    Site preparation, drainage at 50-200 hectare scale, access tracks, ecological + biodiversity compliance. Less heavy than urban civils but bigger in area.

    Wide-area site preparationSuDS at 100+ ha scaleInternal access tracksBNG complianceShared-use landowner interface

    Sample entries in this slice

    • 1.

      Biodiversity Net Gain Compliance for Utility-Scale Solar

      Ecological Consultant CIEEM · CEnv CIEEM Full Member

    + 8-15 more entries in this slice on the full Package.

    Single slice

    £12-18k

    one-off · 12-mo licence

    Request slice access
  • Structural Mounting

    Pile-driven and ground-screw mounting systems, wind loading per BS EN 1991-1-4, snow load assessment, panel-mount fatigue under 25-year operation.

    Pile-driven vs ground-screw selectionWind loading to BS EN 1991-1-4Snow load assessmentPanel-mount fatigue (25-year)Tracker vs fixed-tilt at UK latitudes

    Sample entries in this slice

    • 1.

      Wind Loading Assessment for Single-Axis Tracker Systems

      Structural Lead, Independent Practice · CEng MIStructE

    + 8-15 more entries in this slice on the full Package.

    Single slice

    £14-20k

    one-off · 12-mo licence

    Request slice access
  • Mechanical (Trackers + O&M Access)

    Single-axis tracker drive systems, gearbox + motor selection, soiling assessment + cleaning regime, O&M vehicle access design.

    Tracker drive gearbox + motorSoiling rate by UK regionCleaning regime (water vs dry)O&M vehicle access design

    Sample entries in this slice

    • 1.

      Tracker Gearbox Selection for 25-Year UK Operation

      Senior O&M Engineer, ex-Lightsource bp · CEng MIMechE

    + 8-15 more entries in this slice on the full Package.

    Single slice

    £12-18k

    one-off · 12-mo licence

    Request slice access
  • DC + AC Electrical (Largest Slice)

    DC string design + sizing, inverter selection (string vs central), AC collection 33kV reticulation, transformer specification, BESS integration for hybrid sites.

    DC string sizingString vs central inverter selection33kV AC collectionStep-up transformer specBESS hybrid integration

    Sample entries in this slice

    + 8-15 more entries in this slice on the full Package.

    Single slice

    £22-28k

    one-off · 12-mo licence

    Request slice access
  • Grid Connection + DNO Interface

    ⭑ Premium slice

    DNO application strategy, G99 compliance, ICP appointment + management, grid code testing, P28/P29 voltage step regulation. The slice that determines bankability.

    DNO application strategy + timingG99 compliance evidenceICP appointment + managementGrid code testing (P28/P29)Reactive power Q-V droop

    Sample entries in this slice

    • 1.

      G99 Compliance — What DNO Engineers Actually Look For

      Olusola Adekanmbi · CEng FIET

    + 8-15 more entries in this slice on the full Package.

    Single slice

    £28-38k

    one-off · 12-mo licence

    Request slice access
  • Project / Commercial

    EPC vs split contract structures, PPA structuring, CfD AR7+ navigation, land option vs lease, exit valuation drivers for IRR-linked refinancing.

    EPC vs split contract bankabilityPPA structuring at current strikeCfD AR7+ allocationLand option vs lease25-year IRR + refinancing

    Sample entries in this slice

    • 1.

      CfD AR7 Allocation Round — Lessons from AR5 + AR6

      Commercial Director, Independent Solar Developer · FCCA

    + 8-15 more entries in this slice on the full Package.

    Single slice

    £16-22k

    one-off · 12-mo licence

    Request slice access
Curator + Lead Validators

Who assembled this Package.

Curator-led assembly with cross-tier lead validators. Every entry in every slice runs through the validator workflow before inclusion. No anonymous content. No textbook copy-paste.

Lead Curator

Olusola Adekanmbi

CEng FIET

Lead Curator · ex-Lightsource bp · ex-EDF Renewables · 18 yrs solar + grid

Lead Validators (1)

  • JO

    James Okonkwo

    CEng MIET

    19 yrs electrical design · ex-Atkins-Réalis Power & Renewables

Why this matters · two buyer states

Same product. Different urgency.

If you're growth-seeking

The alternative growth path

UK utility-scale solar is dominated by 4-5 developers who built capability through the 2011-2017 ROC era. New entrants face a knowledge moat — particularly around grid connection and DNO interaction. This Package levels that moat for mid-sized civil + electrical firms.

Built for: Mid-sized civil and electrical contractors (£10-50M revenue) wanting to enter utility-scale solar delivery — and renewable energy developers in adjacent sub-sectors (wind, battery storage) wanting to add solar capability.

If you're pivoting under pressure

Before administration · the survival pivot

Traditional civils contractor whose primary sector (retail park / supermarket pad builds, public-sector school refurb, mid-rise residential groundworks) has contracted significantly since 2022. Utility-scale solar is forecast to triple by 2030 with current deployment dominated by 4-5 incumbent developers. Your existing site-prep + civils + access track skills are 70% of what solar needs. This Package gives you the grid-connection knowledge that determines bankability — the slice the incumbents protect.

UK construction administration counts have been elevated since 2022. EngTree Packages exist for firms that need to pivot 90 days before they hit the cliff, not 18 months after.

Stage 2 · D31b matchmaking

Bought the Grid Connection + DNO Interface slice?
We'll introduce you to firms with the rest.

Stage 2: when multiple firms buy complementary slices of the same Project Package, EngTree's matchmaking algorithm flags the pair as a candidate joint-venture or bid-team match. The platform becomes the discovery layer for JV opportunities previously gated by network or geography.

Matchmaking is opt-in. Anonymous-until-introduction. GDPR-respectful.

Lock founding-buyer pricing.

First 10 firms across all Packages lock founding-buyer pricing for the life of the product. Request early access today — no payment, no commitment, no deck required.

Request early access to 50MW Solar Farm Delivery

Mock CTA — live Stripe checkout activates at Phase 1.5 alongside Pro launch. Project Package count: 0 firms so far.